A first-of-its-kind FynBloem Sustainable Protea Packing Facility in Riviersonderend. You can read more about this project here. |
Cape Town based architectural practice, KUBE architecture is now capable of acting in the capacity of Competent Persons with regard to the new SANS10400XA Energy legislation. What this means is that we are able to perform Rational Designs according to the Regulation and Standards, and make use of the Deemed-to-Satisfy route for compliance...
A) Adhering to
the requirements of all the prescriptive regulations, or
B) Complying with
all functional regulations by:
- Adopting building solutions that comply with the deemed to satisfy requirements of the corresponding part of SANS 10400,
- Reliably demonstrating or predicting with certainty that an adopted building solution has an equivalent or superior performance to a solution that complies with the deemed to satisfy provisions. (Rational design by competent person)
Option 1:
Rational design: This alternative
requires input of a professional “competent” person and involves calculating
the Thermal performance of the building, which should be equal to or better
than a theoretical building that complies with SANS 10400:XA.
Option 2: Compliance with the requirements as specified in SANS10400XA.
Option 3:
Compliance with the requirements of Table 2(Energy Consumption) and Table 3(Energy Demand) contained within SANS10400:XA, which involves calculating the Thermal Performance, Max Energy Consumption
and Max Energy Demand according to SANS204. The input of a professional
“competent” person is required.
Option 4:
Comparison with a compliant theoretical (reference) building: The theoretical max energy consumption and
demand shall be less than or equal to that of a reference building as measured
with thermal performance calculations software accredited by Agrement SA.
The building should be designed according to the deemed-to-satisfy requirements.
The local authorities now require that all building work complies with these requirements and that a competent and registered person submit plans for all proposed building work. Where provided the competent person must specify the location, type and capacity of water heating installations(50% of hot water required is to be provided by non-electrical resistance sources and all exposed hot water piping to be insulated with an R-value of 1).Details of all fenestration and relevant insulation must be clearly indicated. After building work is complete a competent registered person will also need to certify the building as energy compliant in order for the client to obtain an occupation certificate.